• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Thursday, July 23, 2026
Newsletter
SUBSCRIBE
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
Home

In what circumstances in microtunnelling most appropriate for executing gravity slope sewer lines?

by Utility Journalist
August 11, 2017
in Civil Construction, Trenchless technology, Water and Wastewater Treatment
Reading Time: 4 mins read
A A
Share on FacebookShare on Twitter

In the past, gravity slope sewer lines were installed via open cut or tunnelling methods. Today there are two main methods of trenchless sewer construction: horizontal directional drilling (HDD) and microtunnelling.

The key is selecting the most appropriate and technically feasible method – the method chosen must be capable of doing the job in the prevailing environmental conditions and within project specifications.

Here are some environmental conditions and project specifications where microtunnelling is the most appropriate method for a gravity slope sewer installation.

An accurate slope

Proper slope of gravity sewer pipes is important to ensure liquids flow smoothly and any solids don’t clog the pipe. If the pipe is too flat, waste won’t flow away and a pump station will need to be installed to help move the liquid, but a pipe that is too steep will cause liquids to flow too quickly and solids will not be carried away.

Therefore, the chosen method of installation will be dependent on the ultimate grade on that line and the accuracy required to complete the installation.

Microtunnelling is the most accurate pipeline installation method available for civil construction and can install sewer pipelines on-grade, so if the installation needs to be within +/-25mm of accuracy it is the best method.

On-grade installation ensures a steady declining grade is maintained, allowing sewage to be transported down the pipeline by gravity alone.

On the other hand, sewer pipes installed by HDD can incorporate variations throughout the route, and will require pump stations to be installed to ensure the continuous transportation of liquids. These pumps incur additional cost, require ongoing maintenance, consume energy and produce emissions.

Avoiding critical underground infrastructure

As gravity slope sewer lines are installed in urban areas, there is a risk of hitting existing critical underground infrastructure if it is not accurate.

Microtunnelling avoids this risk because the installation will typically go from a manhole to a manhole, or a manhole to an inspection shaft of some sort. Microtunnelling gives you a means of working out of both shafts to install a pipe at the best invert rate required, which in most instances will be completely below all existing infrastructure.

Working in a limited site footprint

Microtunnelling is also the best choice for urban areas where the site footprint has to be kept to a minimum.

Microtunnelling allows a pipeline to be installed from an exact location to an exact location with only enough room for an entry and exit pit to be excavated. This means there is no need for access to any other land as the pits will be along the required pipe route.

As HDD is surface launched, the equipment needs to sit back from the starting point, and because it uses a continuous style of pipe there also needs to be enough room at the exit point to have the pipe laid out.

This can become a problem in urban areas as there is not much space to work in, and depending on the route of the pipe there is a chance that the necessary setback will mean the HDD rig would need to be on someone’s property. At the exit point there may also be limited room where the pipe can be laid out.

Making a choice

When it comes to choosing a method of installing gravity slope sewer lines it is important to take into account the environmental conditions at the site and the project specifications as there may be factors present that will make one technology better than another.

Microtunnelling is only one method of installation but it’s ability to install pipelines on-grade, its limited site footprint and ability to avoid existing underground infrastructure makes it an ideal choice.

 

Related Posts

Image: Prime Creative Media

OptionX joins International No-Dig Auckland as Coffee Cart Sponsor

by Hayley Ralph
July 20, 2026

International No-Dig Auckland 2026 has announced OptionX as a Silver Sponsor of the event, with the company sponsoring the dedicated...

Image: Kim Britten/stock.adobe.com

Major water storage site to double capacity

by Hayley Ralph
July 20, 2026

Barwon Water has begun the first stage of a major project to double drinking water storage capacity at its Pettavel Basin site...

Image: kamonrat/stock.adobe.com

One month left to recognise excellence at the inaugural Utility Awards

by Hayley Ralph
July 15, 2026

With Utility Awards nominations closing on August 7, now is the time to recognise outstanding people, projects, and innovations across...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Utility is the title of choice for decision makers at all levels of water and energy utilities, as well as other major players like consulting engineers and first-tier contractors. Utility is integrated across print and online, and explores the biggest news and issues across the utility industry. It is Australia’s only dedicated utility magazine, and covers all areas of the utility sector, including water and sewer, gas, electricity, communications and the NBN.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Utility

  • About
  • Advertise
  • Subscribe
  • Contact
  • Digital magazine
  • Events
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Water
  • Electricity
  • Projects
  • Water and Wastewater Treatment
  • Spotlight
  • Civil Construction
  • Renewable Energy

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
  • About
  • Advertise
  • Subscribe
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited