• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Sunday, July 12, 2026
Newsletter
SUBSCRIBE
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
Home

What are some of the factors that microtunnelling contractors have to consider when installing pipelines?

by Utility Journalist
April 21, 2015
in Trenchless technology
Reading Time: 4 mins read
A A
Share on FacebookShare on Twitter

Microtunnelling is a pinpoint method of installing a pipe. Most microtunnelling contractors are aiming for a result which would see a pipe installed +/-10mm of design line and grade. However the accuracy of this line can be greatly affected by an accumulation of tolerance errors  – sometimes referred to as tolerance stack.

Any microtunnelling installation begins with a survey of the installation. The set-up requires three ingredients: line, invert and grade. First, let’s look at the line. One of the benefits of microtunnelling is the ‘keyhole factor’. Essentially microtunnelling is a keyhole pipeline in that the pipe is installed via a small vertical shaft that is then microtunnelled to a second vertical shaft, leaving everything in between undisturbed. The issue with small shafts is that the line for the installation is required to be extremely accurate for the set up in that small shaft.

For example, if we were to look at a 4m internal diameter shaft. By the time you allow 500mm to set up your instrument (laser or theodolite/station) you are left with less than 3.5m to establish a perfect line. If there is any error in the establishment of the line the error will then be multiplied out over the length of the line, with the error only being realised on the breakthrough at the reception shaft.

Next, the invert starting point really should be a given, however, with the depth of these installations, transferring the level down can present issues in itself. There may be a requirement to transfer levels, staff on only vertical angles and TBMs with incorrect values, all of which in combination can result in differing magnitudes of error.

Finally, the grade on the line. This is just a matter of punching in some numbers. All instruments are different and so the number of decimal points may differ, which can create confusion. The differentiation between +/- can be difficult to identify. The chainage of the shaft may have moved with no allowance being made.

All of these issues now combine with the instrument itself – is it in calibration? Has it been set up to level or is it on a roll? What is the manufacturer’s specification of error over distance? What are the atmospheric conditions present and how will they affect the accuracy of the instrument?

Now keep in mind, all of these areas of potential error are before the actual installation process begins.

During an installation, microtunnellers are managing the machine through a variety of ground conditions – soft/hard, sticky/flowing, dry/wet, highly abrasive/highly elastic – all of which is constantly changing and affecting the way we drill. All of these factors affect our ability to steer in the ground and remove the ground, not to mention the fluids being utilised and the wear on the bit. The ground conditions will also affect the amount of overcut on the pipe required. Overcut in itself is an opportunity for error. It allows the pipe to move within the ground, however it is critical to allow steering and reduce skin friction. Are my thrust pressures rising? Am I moving the machine or the shaft? Has my instrument moved? These questions all need to be considered.

Once the installation is complete, there are still opportunities for error – was it an encasement pipe? Is there a need to insert the carrier pipe to grade inside this pipe? Will it be centralised and grouted? Are the centralisers a neat fit? What is the grout mix and will it flow consistently?

Are the pipe(s) accurate? What tolerance is there on the manufacture of the pipe? Is the pipe rigid or flexible?

This is without taking into account machinery issues, which are inevitable as we work in a destructive environment.

Taking all factors into account I believe the microtunneller out there, typically covered in mud or grease, does an amazing job consistently delivering precision pipelines. I encourage everyone to consider what they are dealing with. See through the mud!

About Stuart Harrison

Stuart Harrison is the Managing Director of Edge Underground, where he specialises in on-grade microtunnelling installations with millimetre accuracy. Stuart is also the inventor of the AXIS guided boring system, and he is constantly working to improve the effectiveness of this and other trenchless systems used in the installation of gravity sewers.

Related Posts

International No-Dig Auckland will bring together the best of the innovations and advancements in the industry. Images: Prime Creative Media

Auckland Council joins International No-Dig Auckland as Industry Partner

by Hayley Ralph
July 2, 2026

International No-Dig Auckland has welcomed Auckland Council as an official Industry Partner, strengthening the event's role as the meeting place...

Image: Prime Creative Media

No-Dig Down Under returns to Sydney in 2027

by Hayley Ralph
June 10, 2026

Following the success of No-Dig Down Under 2025 in Melbourne, the Southern Hemisphere’s premier trenchless technology conference and exhibition will...

Image: A. Karnholz/stock.adobe.com

Engineering New Zealand joins International No-Dig Auckland as Industry Partner

by Hayley Ralph
June 1, 2026

International No-Dig Auckland has announced Engineering New Zealand as an official Industry Partner for the upcoming event, bringing one of...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Utility is the title of choice for decision makers at all levels of water and energy utilities, as well as other major players like consulting engineers and first-tier contractors. Utility is integrated across print and online, and explores the biggest news and issues across the utility industry. It is Australia’s only dedicated utility magazine, and covers all areas of the utility sector, including water and sewer, gas, electricity, communications and the NBN.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Utility

  • About
  • Advertise
  • Subscribe
  • Contact
  • Digital magazine
  • Events
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Water
  • Electricity
  • Projects
  • Water and Wastewater Treatment
  • Spotlight
  • Civil Construction
  • Renewable Energy

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
  • About
  • Advertise
  • Subscribe
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited