Share

Epic Energy has recently completed restoration of the Port Pirie lateral pipeline (SA), with ongoing maintenance currently underway.

Equipment from Germany will be used to undertake detailed internal inspection and testing of the 73-kilometre pipeline.

The process involves isolating and removing the gas from the pipeline, filling it with water, running a special tool through it to take measurements, removing the water and drying the pipe before reinstating gas flows.

The information obtained will help inform Epic Energy SA’s future pipeline management program, aimed at restoration of full operating pressure for the pipeline.

Jessica Dickers is an experienced journalist, editor and content creator who is currently the Editor of Utility’s sister publication, Infrastructure. With a strong writing background, Jessica has experience in journalism, editing, print production, content marketing, event program creation, PR and editorial management. Her favourite part of her role as editor is collaborating with the sector to put together the best industry-leading content for the audience.

©2020 utilitymagazine. All rights reserved

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

Log in with your credentials

Forgot your details?