• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Wednesday, January 21, 2026
Newsletter
SUBSCRIBE
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
Home

First FTTN NBN trial complete

by Utility Journalist
April 23, 2014
in News, Telecommunications
Reading Time: 2 mins read
A A
Share on FacebookShare on Twitter

The first in-premises test by NBN Co of fibre-to-the-node (FTTN) technology has delivered raw download speeds of 105 megabits per second (Mbps) and upload speeds of 45 Mbps.

The technology trial was conducted recently by NBN Co engineers in Umina, near Woy Woy, on the NSW Central Coast.

Engineers installed a VDSL modem in a shopfront and then connected the existing copper telephone line to a node cabinet in the street.

The node cabinet, which has been erected alongside a Telstra pillar around 100 metres from the shopfront, converts electrical signals transmitted over copper wires into pulses of light that can travel over optical fibres.

NBN Co Chief Executive Officer, Bill Morrow, said:

“This is an important milestone in the rollout of the National Broadband Network (NBN).

“It demonstrates that existing technologies such as the copper network are capable of playing a vital role in delivering high speed broadband to Australians.”

NBN Co Chief Operating Officer, Greg Adcock said:

“As outlined at our analysts’ update today, this speed test is a result of the work by our engineers and construction crews to install a small number of node cabinets in Umina on the NSW Central Coast and Epping in Melbourne’s northern suburbs to pilot the construction and delivery of FTTN.

“Once active, the next step will see NBN Co invite retail service providers to take part in a limited FTTN end user trial in these locations. The aim will be to test the delivery and end user experience of high speed broadband via FTTN to a small number of premises at each location.”

The results of the technology trial bolster the findings of the Strategic Review conducted by the company and published in December 2013.

The Strategic Review determined that the NBN could be delivered sooner and more cost-effectively byincorporating existing capable telecommunications networks with an upgrade path – such as copper and hybrid fibre coaxial cable (HFC) – into the rollout.

According to the Strategic Review, a mixed technology NBN:

  • is estimated to be capable of delivering wholesale download speeds of up to 100Mbps to retail service providers providing services to at least two-thirds of Australians in the fixed-line footprint by 2019,compared to an estimated 57 per cent under the re-evaluation of the previous plan;*
  • could save taxpayers more than $31 billion compared to the Fibre to the Premises-only rollout model; and
  • could lead to less disruption and less invasiveness to the homes and driveways of millions of Australians

The company is planning a widescale commercial rollout of technologies including FTTN next year following the renegotiation of NBN Co’s Definitive Agreements with Telstra.

Related Posts

Image; Tara/stock.adobe.com

Mixed reactions to prolonged life of Australia’s largest coal-fired plant

by Staff writer
January 21, 2026

Origin Energy hopes keeping Australia's largest coal-fired power plant open longer will add to grid stability without compromising its emission...

Image: The Desert Photo/stock.adobe.com

Battery storage systems a growing competitive market

by Staff writer
January 21, 2026

A new report has highlighted the momentum and growing competition in  BESS (battery energy storage system market in Australia as...

Images: Binder

Increasing capacity at wastewater plants with the same footprint and lower energy use

by Contributed
January 21, 2026

This case study from the Waste Water Treatment Plant in Munich, Germany  shows how it gained a capacity increase with...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Utility is the title of choice for decision makers at all levels of water and energy utilities, as well as other major players like consulting engineers and first-tier contractors. Utility is integrated across print and online, and explores the biggest news and issues across the utility industry. It is Australia’s only dedicated utility magazine, and covers all areas of the utility sector, including water and sewer, gas, electricity, communications and the NBN.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Utility

  • About
  • Advertise
  • Subscribe
  • Contact
  • Digital magazine
  • Events
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Water
  • Electricity
  • Projects
  • Water and Wastewater Treatment
  • Spotlight
  • Civil Construction
  • Renewable Energy

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
  • About
  • Advertise
  • Subscribe
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited