• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Friday, November 14, 2025
Newsletter
SUBSCRIBE
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
Home News

New ground-mounted solar system for Whyalla hydrocarbon plant

by Journalist
June 24, 2019
in Electricity, News, Projects, Solar
Reading Time: 2 mins read
A A
Share on FacebookShare on Twitter

A new 2.12MW ground-mounted solar energy system has been completed on time by AGL at Santos’ Port Bonython hydrocarbon processing plant in Whyalla, South Australia.

The system will generate more than 3GW hours of clean energy per annum for the energy company, representing six per cent of the electricity used at the plant, which would be enough to power more than 500 average Australian homes.

AGL Interim Chief Customer Officer, Mark Enzinger, said the project was completed on time and safely by AGL’s Business Energy Solutions team in less than nine months.

“We are proud to have completed this project which helps Santos deliver on its strategy of integrating renewable energy into its sites to lower costs and reduce its carbon footprint,” Mr Enzinger said.

“We also delivered on our commitment to maximise local content in the project with the solar panel mounting system manufactured in Adelaide, the inverter station made in Melbourne, and the installation carried out by workers from Whyalla.

“The team completed the project under an engineering, procurement and construction contract that required the delivery of the 5,580 module solar system and a complex high voltage interconnection.

“The solar system consists of 62 array tables of solar modules, each weighing about six tonnes, and covers 14,500m2 in total.

“The modules were mounted using an innovative array table system which combines modular design, prefabrication and rapid deployment, streamlining engineering and procurement and transferring cost, time and risk from the construction site to the factory.”

Related Posts

By adopting the new guidelines, utilities can safeguard their critical infrastructure and meet the growing demand for uninterrupted energy solutions. Image: Intelepower

Powering compliance without compromise

by Katie Livingston
November 12, 2025

There’s a new Australian Standard for safety, reliability and compliance of battery chargers in stationary applications. Here’s what you need...

Image: Barwon Water

Customers save under Barwon Water conservation initiative

by Katie Livingston
November 12, 2025

Barwon Water has saved almost 4ML of drinking water  through a proactive partnership with Australia's largest co-op housing provider.  Barwon...

Image: Horizon Power

Horizon Power and Pacific Energy team up again to power remote WA community

by Katie Livingston
November 12, 2025

Pacific Energy has signed a 20-year power purchase agreement with Horizon Power to deliver a new hybrid power system to...

Please login to join discussion

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Utility is the title of choice for decision makers at all levels of water and energy utilities, as well as other major players like consulting engineers and first-tier contractors. Utility is integrated across print and online, and explores the biggest news and issues across the utility industry. It is Australia’s only dedicated utility magazine, and covers all areas of the utility sector, including water and sewer, gas, electricity, communications and the NBN.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Utility

  • About
  • Advertise
  • Subscribe
  • Contact
  • Digital magazine
  • Events
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Water
  • Electricity
  • Projects
  • Water and Wastewater Treatment
  • Spotlight
  • Civil Construction
  • Renewable Energy

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
  • About
  • Advertise
  • Subscribe
  • Contact

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited