• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Wednesday, July 15, 2026
Newsletter
SUBSCRIBE
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
Home

New powerlines halve bushfire risk  

by Jessica Dickers
May 10, 2016
in Company news, Electricity, News, Policy, Powerlines, Safety and Training
Reading Time: 2 mins read
A A
Share on FacebookShare on Twitter

New safety regulations have recently come into effect which require Victorian electricity companies to use new technology that can halve the risk of powerlines starting bushfires.

The Electricity Safety (Bushfire Mitigation) Regulations 2015 require electricity distributors to install Rapid Earth Fault Current Limiter (REFCL) technology across their networks.

The device stops an electrical current within milliseconds of a power line coming into contact with the ground or vegetation – stopping a fault before it can start a fire.

The technology was developed in Victoria in response to the recommendations of the 2009 Victorian Bushfires Royal Commission, intended to make powerlines safer in bushfire risk areas.

Final testing in Kilmore last year found the REFCL technology reduces the likelihood of a bushfire starting from a high voltage powerline fault by ten-times.

Over the next seven years, electricity distributors will be required to install REFCLs in 45 substations in bushfire danger areas across the state.

Victorian Minister for Energy and Resources Lily D’Ambrosio said, “These higher safety standards and cutting edge technology will help protect Victorians from the risk of bushfires caused by powerline faults.

“We are doing everything we can to make Victoria’s power network safer to ensure the tragic events of the 2009 Black Saturday bushfires never happen again.”

In addition, more than 1,000 remotely adjustable automatic circuit re-closers will be rolled out on the single-phase, high-voltage network, which will allow distributors to detect faults more quickly at times of high bushfire risk.

In areas of high bushfire risk, electricity distribution businesses will also be required to progressively replace their powerlines by insulating the cables or burying them underground.

The Victorian Government’s new higher safety standards aim to halve the risk of powerline-ignited bushfires across regional Victoria.

Related Posts

The grid battery at Transgrid’s Wallgrove substation in Western Sydney. Image: Transgrid

Transgrid expands battery role

by Hayley Ralph
July 14, 2026

Grid-forming batteries are set to play a larger role in maintaining system strength on the NSW electricity network as coal-fired...

kwik-ZIP at Ozwater 2025 in Adelaide. 
Image: kwik-ZIP

kwik-ZIP to showcase pipeline solutions at WIOA NSW

by Hayley Ralph
July 14, 2026

kwik-ZIP will exhibit at the 2026 Water Industry Operations Association (WIOA) NSW Conference and Exhibition in Newcastle from September 9...

Image: MMerellinn/stock.adobe.com

Unitywater reappoints Board directors

by Hayley Ralph
July 14, 2026

Unitywater has reappointed Megan Corfield and Sarah Zeljko to its Board of Directors for a new term commencing October 1,...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Utility is the title of choice for decision makers at all levels of water and energy utilities, as well as other major players like consulting engineers and first-tier contractors. Utility is integrated across print and online, and explores the biggest news and issues across the utility industry. It is Australia’s only dedicated utility magazine, and covers all areas of the utility sector, including water and sewer, gas, electricity, communications and the NBN.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Utility

  • About
  • Advertise
  • Subscribe
  • Contact
  • Digital magazine
  • Events
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Water
  • Electricity
  • Projects
  • Water and Wastewater Treatment
  • Spotlight
  • Civil Construction
  • Renewable Energy

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
  • About
  • Advertise
  • Subscribe
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited