Share

Unitywater will replace an aging section of sewer pipe from under Weyba Creek in Noosa (QLD).

The replacement will see 350 metres of new pipe installed to upgrade old infrastructure and protect the Noosa River.

The works will involve drilling 10 metres under Weyba Creek, and installing a new pipe parallel to the existing infrastructure. The drilling section of the project will be carried out continuously during the day from Monday to Sunday, to prevent the tunnel from closing and the drill becoming stuck.

Works will begin in October 2015 and be completed before Christmas, with the Weyba Creek waterway remaining open to recreational users.

The new section of pipe will run from the northern side of Weyba Creek, near the corner of Ravenswood Drive and Mossman Court, under Weyba Creek to Council land adjacent to Settler’s Cove, off Serenity Close.

Jessica Dickers is an experienced journalist, editor and content creator who is currently the Editor of Utility’s sister publication, Infrastructure. With a strong writing background, Jessica has experience in journalism, editing, print production, content marketing, event program creation, PR and editorial management. Her favourite part of her role as editor is collaborating with the sector to put together the best industry-leading content for the audience.

©2024 Utility Magazine. All rights reserved

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

Log in with your credentials

Forgot your details?