• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Wednesday, November 12, 2025
Newsletter
SUBSCRIBE
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
Home News

SA Water reworks Eyre Peninsula desalination plant design

by Staff Writer
February 19, 2024
in Desalination, News, Pipelines, Projects, Spotlight, Water
Reading Time: 3 mins read
A A
Billy Lights rock
Share on FacebookShare on Twitter

SA Water is continuing to workshop the design for its proposed desalination plant at Billy Lights Point in response to feedback and scientific analysis.

The utility said it reworked the design to reflect its commitment to minimising impacts to the coastal and marine environment following early engagement and analysis.

The proposal involves building a small-scale plant designed to provide long-term water security for the people of the Eyre Peninsula and ensure the ongoing health of the Uley South Basin, which provides the majority of the region’s drinking water.

The design changes include using a trenchless construction method for the installation of the plant’s intake and outfall pipes (where seawater will be drawn in and concentrated seawater will be dispersed), and the placement of these pipes in a deeper area off the coast of Billy Lights Point within a higher flushing zone.

SA Water Senior Manager of Capital Delivery, Peter Seltsikas, said the work forms part of a comprehensive process with early contract involvement partner ACCIONA.

“We have listened to and responded to feedback from the Project Reference Group and other key community groups, our regulators and various other government agencies, which highlighted the importance of minimising disturbance to the Billy Lights Point coastline and avoiding the shallow waters of Proper Bay,” Mr Seltsikas said.

“We will need to conduct additional geotechnical studies to refine the scope of the trenchless construction method, and from early next month, we will use a barge and small drill rig off the coast of our existing nearby wastewater treatment plant to collect soil and rock samples from the ocean floor.

“This will enable a better understanding of the site’s geology, to determine the exact type of construction method, which could include directional drilling or tunnelling.”

The geotechnical work is expected to take several weeks to complete. SA Water said the results will help inform a detailed concept design, which will be incorporated into its development application for the project, to be lodged with the State Commission Assessment Panel in early 2024.

“The Uley South Basin is the primary source of drinking water for Port Lincoln and the lower Eyre Peninsula, but the Basin is under stress so a desalination plant is essential to augment supply,” Mr Seltsikas said.

“A combination of long-term lower groundwater recharging of the Basin and ongoing extraction rates to meet community demand means the aquifer’s water levels are likely to reach historically low levels by the mid-2020s.

“We need to build the desalination plant at Billy Lights Point to protect the health of the Basin and provide an alternative climate-independent water source to deliver drinking water to the local community.”

SA Water said it will also be undertaking further hydrodynamic modelling within the preferred marine zone and a re-run of the particle tracking model to support the geotechnical studies, which will add to existing knowledge of mussel spat movement and narrow down the exact alignment and location of the intake and outfall pipes.

“We are planning to place the pipes in a zone to the east of Billy Lights Point, up to 1.5km offshore and more than 2.5km from existing mussel leases,” Mr Seltsikas said.

“This location is near a commercial shipping corridor which extends from the marina to Cape Donnington, and is within water around ten to 15m deep.

“The outfall for our Port Lincoln Wastewater Treatment Plant sits outside of this zone further to the south, and our extensive monitoring to date has demonstrated no negative impact to the local marine environment from this marine infrastructure.”

Related Posts

Dan Redman, Rachael Turner and Todd Eagles at the AFR Energy Awards. Image: ActewAGL

ActewAGL takes out the top spot in national innovation awards

by Katie Livingston
November 6, 2025

ActewAGL’s online home electrification service, Electrify with ActewAGL, took out the top spot in the Innovation (established) category at the Australian Financial Review’s...

Controlling networks pressure helps utilities to reduce water leakage, extend the life of assets and create a more resilient and efficient system. Image: Taggle

Taking the pressure off

by Katie Livingston
November 6, 2025

Water is the lifeblood of a thriving community and with temperatures rising we can’t afford to waste a single drop....

Driver fatigue contributes to around 20 per cent of all road incidents in Victoria. 
Image: Scott Donkin/stock.adobe.com

Safety in the field

by Katie Livingston
November 6, 2025

When disaster strikes, everyone is depending on utility technicians to keep our essential services running, and field crews need to...

Please login to join discussion

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Utility is the title of choice for decision makers at all levels of water and energy utilities, as well as other major players like consulting engineers and first-tier contractors. Utility is integrated across print and online, and explores the biggest news and issues across the utility industry. It is Australia’s only dedicated utility magazine, and covers all areas of the utility sector, including water and sewer, gas, electricity, communications and the NBN.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Utility

  • About
  • Advertise
  • Subscribe
  • Contact
  • Digital magazine
  • Events
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Water
  • Electricity
  • Projects
  • Water and Wastewater Treatment
  • Spotlight
  • Civil Construction
  • Renewable Energy

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
  • About
  • Advertise
  • Subscribe
  • Contact

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited