Share

Roxtec and TasNetworks recently collaborated to solve an ongoing issue with silt and water seeping into TasNetworks’ Hadspen substation, in Tasmania’s north.

Water ingress through the conduits and the moisture condensation was creating partial discharge on the 22kV switchgear in the substation.

TasNetworks approached Roxtec Regional Manager Gary Lee, and through working together, Mr Lee was able to present a reliable cable sealing solution for the TasNetworks asset team.

“We are pleased to assist TasNetworks in providing cable seals that will protect the network assets in Tasmania for many years to come,” Mr Lee said.

The existing leaking medium was replaced by openable Roxtec RS seals.

TasNetworks Area Asset Manager – EHV Substations, Alan Brown, said that the Hadspen solution was working well and that the business had installed Roxtec seals at its Lindisfarne substation in southern Tasmania and four other sites were being prepared.

Jessica Dickers is an experienced journalist, editor and content creator who is currently the Editor of Utility’s sister publication, Infrastructure. With a strong writing background, Jessica has experience in journalism, editing, print production, content marketing, event program creation, PR and editorial management. Her favourite part of her role as editor is collaborating with the sector to put together the best industry-leading content for the audience.

©2020 utilitymagazine. All rights reserved

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

Log in with your credentials

Forgot your details?