State Water Corporation (NSW) is seeking tenders for the design, supply, and installation of air conditioning, ventilation and hydraulic power unit, etc. for the new control building at Mollee Weir.
The contractor will need to reconnect mains power to the new control room and relocate all gate control switchgear from the temporary control room.
Submissions for this tender close Tuesday 11 November 2014.