Goulburn-Murray Water is seeking tenders for the construction of pipelines as part of the GMW Connections Project.
These comprise approximately a total length of 23.5km of irrigation pipelines consisting of:
- 4.6 Km of pipeline ranging from 560 to 900 Diameter in the Central Goulburn Irrigation district
- 5.0 Km of pipeline ranging from 500 to 800 Diameter in the Torrumbarry Irrigation District
- 2.4 Km of pipeline ranging from 560 to 800 Diameter in the Murray Valley Irrigation District
- 10.5 Km of pipeline ranging from 160 to 710 Diameter in the Rochester Irrigation District
Submissions to tender close Monday 23 March 2015.
(Tender details available under ‘All Open Tenders’)