Share

Coliban Region Water Corporation (VIC) is proposing to appoint a consultant to calibrate the 2014 Bendigo Sewer Model.

Calibration must be reached for the Dry Weather (DWF) and Wet Weather Flow (WWF) conditions based on the methodology and specific requirements contained in ‘Coliban Water Sewerage Network Model Build and Calibration Specification’, CWSHM-V06, Version 6.

Submissions for this tender close Wednesday 15 October 2014.

©2020 utilitymagazine. All rights reserved

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

Log in with your credentials

Forgot your details?