Sunshine Coast Regional Council (QLD) is seeking tenders for the construction of a complete system to pump sewage combined with leachate from the Nambour landfill sewer pump station to the nominated connection location at the Unitywater sullage pipeline through to the sewerage treatment plant.

Works include:

  • Supply, installation and commissioning of a sewer pump station
  • Decommissioning and demolition and disposal of existing septic tanks
  • Supply, installation and commissioning of duel sewer/leachate rising main to sewerage treatment plant
  • Supply, installation and commissioning of an internal leachate main from existing leachate wells to the onsite tank farm
  • Supply, installation testing and commissioning of all (internal and external to site) civil, electrical and mechanical equipment to fully operational status
  • Undertaking repairs to existing leachate well infrastructure
  • Excavation and placement of sewer pipelines within the site
  • Installation of pumps and telemetry systems
  • Horizontal Directional Drilling: road under-boring both Bli Bli Road and the Bruce Highway from the Nambour Landfill site through to Unitywater Nambour sewerage plant (Council has obtained Main Roads approval for all under road boring)
  • Testing, commissioning, quality assurance, certification and warranty for the complete system

Submissions to tender close 22 November 2016.

Lauren brings a fresh approach to content. While she’s previously written for publications as diverse as Australian Geographic, The Border Watch and Girlfriend, she’s found her true passion in her current role as an editor in the world of energy and infrastructure trade magazines.

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

©2019 utilitymagazine. All rights reserved

Log in with your credentials

or    

Forgot your details?

Create Account