• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Thursday, December 11, 2025
Newsletter
SUBSCRIBE
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
No Results
View All Results
Home

Wivenhoe power station upgrade complete

by Lauren Cella
October 26, 2016
in Asset management, Civil Construction, Electricity, News, Projects, Transformers and Switchgear
Reading Time: 2 mins read
A A
Share on FacebookShare on Twitter

CS Energy’s pumped storage hydroelectric Wivenhoe Power Station near Fernvale in South East Queensland has received $13.5 million upgrade.

Key works included the replacement of the draft tube bearing, internal pump painting, replacement of the guard gate rollers at Splityard Creek Dam and replacement of the generator transformer high voltage protection system.

The major contractors for the project were MHPS Plant Services, Crown Engineering, McElligotts Painting and Berg Engineering.

The 85-day upgrade was carried out on unit one at the power station and brought more than 90 contractors to site, used more than 100 tonnes of scaffolding, 50 tonnes of garnet for sandblasting and 2,300 litres of paint.

CS Energy Chief Executive Officer, Martin Moore, said the overhaul would ensure the power station operated safely, reliably and efficiently into the future.

“Wivenhoe Power Station is a peaking power station that has provided quick start capacity to the national electricity grid since 1984,” Mr Moore said.

“The power station works like a giant rechargeable battery by cycling water between an upper and lower reservoir.

“Wivenhoe’s upper reservoir, Splityard Creek Dam, has a capacity of 23,300 megalitres, which is enough to run the power station for up to 10 hours at full load.”

More than 47,000 hours were worked on the upgrade and the unit was available to generate electricity from 20 October 2016, four days ahead of the originally scheduled completion date of 24 October 2016.

The early completion was largely the result of the unit being in better condition than expected since its last upgrade.

Related Posts

Arda/stockadobe.com

$128 billion roadmap for the nation to be energy ready by 2050

by Staff writer
December 10, 2025

120 gigawatts of wind and solar, 32 GW grid-scale batteries and 14 GW of flexible gas along with 6,000 km...

Image: Elias/stockadobe.com

Meeting water demand in one of Australia’s fastest growing regions

by Staff writer
December 10, 2025

One Victorian water utility, once predominately rural is taking steps to meet the added demand of of peri-urban and regional...

Image: Equis

Melbourne launches new $1.1bn renewable energy hub

by Tom Parker
December 10, 2025

Melbourne will be home to one of Australia’s largest grid-scale BESS (battery energy storage systems) as part of a new...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Utility is the title of choice for decision makers at all levels of water and energy utilities, as well as other major players like consulting engineers and first-tier contractors. Utility is integrated across print and online, and explores the biggest news and issues across the utility industry. It is Australia’s only dedicated utility magazine, and covers all areas of the utility sector, including water and sewer, gas, electricity, communications and the NBN.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Utility

  • About
  • Advertise
  • Subscribe
  • Contact
  • Digital magazine
  • Events
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Water
  • Electricity
  • Projects
  • Water and Wastewater Treatment
  • Spotlight
  • Civil Construction
  • Renewable Energy

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • Contracts awarded
    • Open tenders and opportunities
    • Events
  • Features
  • Water
  • Wastewater
  • Gas
  • Electricity
  • Civil Construction
  • Events
  • About
  • Advertise
  • Subscribe
  • Contact

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited